Archive for June, 2010
Chief Guide : Jonas Gerald
Route : 8 Day TK Lemosho
Latest Guide report received @ 1149 BST on Monday 28th June 2010 :
We arrived at Moir Hut @ 1445 and all four climbers are doing well. It is sunny but breezy today. The climbers are enjoying the fantastic views.
Chief Guide : Leonard Solomon
Route : 7 Day TK Rongai
Latest guide report received @ 0913 BST on Monday 28th June 2010 :
We have arrived at Horombo already! Both climbers are doing great and are relaxing now.
Chief Guide : Deo Shayo
Route : 7 Day Machame
Latest guide report received @ 1411 BST on Monday 28th June 2010 :
The climber is tired as she was yesterday. She has tired legs and has lost her appetite. She has a slight asthma problem also and has been using her inhaler since the first day. She says that now we have reached Barafu this is as far as she will go before descending. She is happy with this decision. We left Karanga @ 0805 and arrived at Barafu @ 1540. We have had good sunny weather today.
Chief Guide : Nick Basso
Route : 7 Day TK Rongai
Latest guide report received @ 1120 BST on Monday 28th June 2010 :
We arrived at Barafu @ 1315 and both climbers are doing great. We have prepared our gear and are ready to start to the summit at midnight.
Chief Guide : Deodatus Na’alli
Route : 7 Day Machame
Latest guide report received @ 0732 BST on Monday 28th June 2010 :
We have a brilliant morning here on Mount Kilimanjaro this morning. Everything is perfect this morning. We are on our way from Machame Huts to Shira 2 Camp.
Chief Guide : Leonard Solomon
Route : 7 Day TK Rongai
Latest guide report received @ 0741 BST on Monday 28th June 2010 :
We are on the way from Mawenzi Tarn Hut to Horombo Huts and both climbers are doing fine, though they are both experiencing slight headaches which is perfectly normal at this altitude.
Chief Guide : Deo Shayo
Route : 7 Day Machame
Latest guide report received @ 1504 BST on Sunday 27th June 2010 :
The climber is very tired today. We left Barranco @ 0810 and arrived at Karanga @ 1351. We have decided to overnight here at Karanga instead of pushing on to Barafu. We will see how she feels in the morning.
Chief Guide : Nick Basso
Route : 7 Day TK Rongai
Latest guide report received @ 0732 BST on Monday 28th June 2010 :
We are on our way to Barafu Camp and both climbers are doing well. The weather on Kilimanjaro is sunny today.
Chief Guide : Joshua Rhuhimbi
Route : 7 Day TK Rongai
Latest guide report received @ 1319 BST on Saturday 26th June 2010 :
We started from Barafu @ 0015 this morning and 3 climbers reached the summit @ 0715. 2 climbers stopped @ 5200m @ 0230 due to bad stomach aches. All 5 climbers are fine and on the way to Mweka Camp.
Chief Guide : Patrick Joseph
Route 7 Day KAS Rongai
Latest guide report received @ 1529 BST on Saturday 26th June 2010 :
Both climbers reached the summit of Mount Kilimanjaro. We started from Barafu @ 2309 last night and arrived at Uhurui Peak @ 0615 this morning.The weather last night was cool.


